We look smart!
I had just finished a project presentation this morning despite the fact that it has already been a week after my last exam. So how come there was still a presentation?
FYI, this presentation was for one of my module and it is a competition in fact. The module is called "Design and Innovative Project" where we innovate and design a project (as you can tell from the name lol). So this module was 2 AU, which supposed to be relax and chill (the more AU it is, the more score weightage it carries and the more hours of teaching time). Somehow, it has turned into the most time-consuming module among all. We were allocate 3 hours per week to do the project on the timetable, then off the timetable I think we spent like another 3, 4 hours to do this crappy project. Why I said it is crappy because we what did for the project is not like the generic ones that everybody does, where they actually came up with a physical product for the project, instead what we did was just theoretical study, calculations and analysis. And there were not much to take away from the project. The reason why this project being so unstructured and not project-worthy, is because we are the guinea pig to the project, and it was natural things did go smooth sail. However, by hook or by crook we had pulled through the whole project and scrape through the competition. Here's a photo of my team, ten handsome guys.
Ok, I'm so tired now, after so much whining.
Goodnight.
FYI, this presentation was for one of my module and it is a competition in fact. The module is called "Design and Innovative Project" where we innovate and design a project (as you can tell from the name lol). So this module was 2 AU, which supposed to be relax and chill (the more AU it is, the more score weightage it carries and the more hours of teaching time). Somehow, it has turned into the most time-consuming module among all. We were allocate 3 hours per week to do the project on the timetable, then off the timetable I think we spent like another 3, 4 hours to do this crappy project. Why I said it is crappy because we what did for the project is not like the generic ones that everybody does, where they actually came up with a physical product for the project, instead what we did was just theoretical study, calculations and analysis. And there were not much to take away from the project. The reason why this project being so unstructured and not project-worthy, is because we are the guinea pig to the project, and it was natural things did go smooth sail. However, by hook or by crook we had pulled through the whole project and scrape through the competition. Here's a photo of my team, ten handsome guys.
Ok, I'm so tired now, after so much whining.
Goodnight.
Comments
Post a Comment